Pecos River crossing

Pecos River bridge construction

Excavation and foundation work cut into the rock of the east-bank approach.↗ Enlarge1957 bridge construction and completed views

Collection: Mr. John Allegra of Del Rio

East-bank foundation work

Here we are looking at the foundation being set in the bedrock on the east bank approach. The hill with the dirt road will eventually be cut for the current US 90.

Workers stand on top of the west column base above the Pecos River.↗ Enlarge1957 bridge construction and completed views

Collection: Mr. John Allegra of Del Rio

West column base

The base section of the west column. Can you see the men on top of the structure? Some of the flood damage to the river bottom can be seen in this photo.

The west column base stands beside the temporary construction crossing.↗ Enlarge1957 bridge construction and completed views

Collection: Mr. John Allegra of Del Rio

West column and construction crossing

Another view of the base section of the west column. A temporary lower water bridge built to aid in construction can be seen in this view. Debris from the east bank bank foundation can be seen at the top of the image.

The east-bank foundation and column base face the nearly complete west column.↗ Enlarge1957 bridge construction and completed views

Collection: Mr. John Allegra of Del Rio

Foundations and columns taking shape

The foundation on the east bank cliff is progressing, the west bank column is nearly complete, and the base of the east column has been set.

A tall west-bank column rises above the river.↗ Enlarge1957 bridge construction and completed views

Collection: Mr. John Allegra of Del Rio

Nearly complete west column

A better view of the nearly complete west column.

Two slender concrete columns rise beside the west-bank approach road.↗ Enlarge1957 bridge construction and completed views

Collection: Mr. John Allegra of Del Rio

West approach columns

The two minor columns before the west bank approach are nearly complete.

The completed steel Pecos River bridge spans the water between rocky banks.↗ Enlarge1957 bridge construction and completed views

Collection: Mr. John Allegra of Del Rio

The completed Pecos River bridge

The completed bridge. Note the water level, the Amistad Reservoir is very up at this time.

The completed bridge crosses above the old road on the west bank.↗ Enlarge1957 bridge construction and completed views

Collection: Mr. John Allegra of Del Rio

Completed bridge at the west bank

A view of the west bank after completion. Note the old road.

A group of people watches the bridge construction from a rocky overlook.↗ Enlarge1957 bridge construction and completed views

Collection: Mr. John Allegra of Del Rio

Sunday afternoon at the construction site

According to Mr. Allegra going to watch the 1957 bridge construction was a popular Sunday afternoon past time. Del Rio was that much fun?

From the original archive

The Pecos River construction photographs

Photograph viewer

Original image ↗Next collection →