BROWSE THE ARCHIVE / 31 PAGES
AustinStories & history
Road histories, original commentary and reporting from the archive.
Stories & history
31 pages- 35th and 38th Street Freeway Plans
- 1969 Freeway Plans for Austin
- Austin’s 2000 Toll-Road Loan: Big Money, Unfinished Roads
- Austin’s 2004 Toll-Road Plan: Free Lanes, Paid Lanes and a Bigger Gamble
- Central Texas toll roads in 2001: fast track, missing land
- Cesar Chavez and First Street Freeway Plans
- Koenig Lane and RM 2222 Freeway History
- MoPac in 2001: CAMPO let the study proceed, with strings attached
- MoPac in 2001: seven experts, a few hand grenades and no easy lane
- MoPac in 2001: The Lane Had to Go Somewhere
- MoPac in 2002: A Hard-Won Compromise Runs Out of Money
- MoPac schematics: the 2001 preliminary design
- MoPac under construction, 1971
- RM 2222’s AstroTurf experiment, 1971
- SH 45 in 2002: Ten Million Dollars and a Disputed Loop
- SH 45 North in 2001: A Nine-Page Fax and a Half-Billion-Dollar Road
- SH 45 North in 2001: Cedar Park’s fight over the western endpoint
- SH 45 South in 2001: Hays County, Buda and a road on hold
- SH 45 South in 2001: State approval and a public scolding
- SH 45 South in 2001: the road that turned growth policy into pavement
- SH 45 South in 2002: Which Connection Comes First?
- SH 130 bonds in 2001: Travis County offered half. The state wanted all.
- SH 130 in 2000: The Eastern Route Wins the Argument
- SH 130 in 2001: a top priority that missed the federal funding request
- SH 130 in 2001: an eastern route, and two very different reactions
- SH 130 in 2002: A Preferred Builder, With an Agreement Still Ahead
- SH 130 right-of-way funding in 2001: the counties wanted the road, not the full land bill
- Southwest Parkway History in Austin
- Travis County road bond results in 2001: voters said yes, the SH 130 argument stayed open
- US 183 airport freeway funding in 2001: $10.5 million disappears
- US 183A in 2001: Environmental clearance and the toll-road timetable
