TexasFreeway

Preserving the travel history of Texas.

Houston / Westpark corridor archive

The Westpark Tollway corridor before major construction

Late 2000–September 2001 photographs

Before concrete and toll plazas arrived, the Westpark corridor was still a rail bed, a local road and a chain of ordinary intersections. These photographs travel west from Loop 610 to Addicks-Howell.

Westward view of the former rail corridor east of Chimney Rock with the Southwest Freeway at right.↗ Enlarge

Collection: TexasFreeway Houston construction photographs

A rail bed and roadside grass marked the future tollway east of Chimney Rock.

15 photographs · Loop 610 to Addicks-Howell

Follow the corridor before the tollway.

Scan the photographs and captions, or settle into the larger slideshow.

Choose a part of the Westpark corridor.

Jump to section
Westpark before constructionBack to top ↑

Chimney Rock, US 59, Fondren and Gessner

The inner Westpark corridor

Loop 610 to Gessner

8 archive photographs

Photos start near Loop 610 and proceed westward

Rail bridge, corridor and crossing

The Beltway 8 crossing

Beltway 8 to Old Westheimer

4 archive photographs

Rail removal toward Highway 6

The corridor west of Beltway 8

Eldridge to Addicks-Howell

3 archive photographs

Westpark Tollway corridor map

1 archive photographs

From the original archive

Westpark corridor before major construction

Back to top ↑

Photograph viewer

Original image ↗Next collection →