US-90A Final Construction Schematics

The final 2001 construction design follows Houston’s US 90A project from east of Post Oak westward toward Beltway 8, with every archived plan sheet available at full size.

Created and last updated 23-April-2001

Location map for the US 90A construction project and proposed Fort Bend Parkway Tollway.

TexasFreeway Houston archive

The project corridor runs west from the Post Oak area toward Beltway 8.

US 90A construction project location map

Location map. The proposed Fort Bend Parkway Tollway is shown in blue. South of Beltway 8 it is nearly certain to be constructed. Between Beltway 8 and IH-610, the project is under study.

The historical account and schematic captions below are preserved from the 2001 TexasFreeway page. Project status statements remain dated to that source.

US-90A Final Construction Schematics

01 / PROJECT BACKGROUND

A grade-separated “mini-freeway”

This is the final construction design that I downloaded from the TxDOT web site. I have organized it to make it easier to view. The contract for construction will be awarded in June 2001. Estimated cost is $49.5 million. Work on 90A north of this segment has been underway for over a year and will be built to the same standards, which is fully-grade separated but not access controlled. (see map.)

US 90 will be Houston's first, and hopefully only, "mini-freeway" or "superstreet." (I consider Memorial to be fully access controlled for it's freeway-like section.) The facility is fully grade separated at all intersections but is not controlled access. The median will have a few, widely spaced breaks in it to allow left turns. All overpasses will have six lanes, and between overpasses the roadway will generally have 8 lanes. Since there is a railroad track on the north side of the right-of-way, the westbound lanes will effectively be access-controlled since there is no property access over the railroad tracks, except in one location just west of Hillcroft.

So is a mini-freeway a good thing a or bad thing? Well, that depends on the alternative, of course. It's a bad thing if the mini-freeway is being built instead of a fully controlled-access freeway. It'a a good thing if the other alternative was a facility with traffic lights. The improvements to 90a will be a great benefit to motorists since the traffic lights will be eliminated. Still, I feel that this corridor should have been designated as a full freeway to provide an alternate freeway route to US 59, the Southwest Freeway, which is possibly the busiest freeway in the United States at 371,000 vehicles per day. The southwest freeway will be very difficult to further expand because it has maxed-out its right-of-way; at this time, no further improvements are plannned for the section of US 59 north of US 90A. I don't know the factors that played into the decision to build the "mini-freeway". I assume cost and the need to acquire a lot of right-of-way were at the top of the list.

As a point of historical interest, this section of US 90A was one of Houston's first divided four-lane highways (or dual-carriageway, as it was called back in those days.) A 1952 map shows this section of 90A as a four-lane divided. This route was signed as US 90A and also as US 59 at the time (see map). US 59 did not start to take shape until the early 1960's.

1952 Houston road map showing US 90A as a divided four-lane highway.

TexasFreeway Houston map archive

1952 Houston road map

The road map shows US 90A and its divided roadway southwest of central Houston.

1949 Houston freeway planning map showing the period route designations.

TexasFreeway Houston map archive

1949 Houston freeway planning map

US 90A was also signed as US 59 at the time.

02 / POST OAK

East end and Post Oak

These schematics start at the east end and work westward

US 90A construction schematic: East of Post Oak.

Source: TxDOT construction plans, preserved by TexasFreeway

East of Post Oak (148K)

This shows the facility east of Post Oak Boulevard, with 8 lanes.

US 90A construction schematic: Just east of Post Oak.

Source: TxDOT construction plans, preserved by TexasFreeway

Just east of Post Oak (219K)

This view shows the facility just east of Post Oak. The through lanes are elevated and the frontage roads are at grade.

US 90A construction schematic: At Post Oak.

Source: TxDOT construction plans, preserved by TexasFreeway

At Post Oak (249K)

This view shows the crossing over Post Oak Boulevard. Note that Post Oak is already an overpass over 90A. The new 90A lanes will go over the Post Oak overpass, which was constructed around 1984. The schematic is difficult to interpret, but the roadway profile beneath the schematics helps clarify what is going on.

US 90A construction schematic: Just west of Post Oak.

Source: TxDOT construction plans, preserved by TexasFreeway

Just west of Post Oak (232K)

The transition zone is long because of the high crossing over Post Oak.

US 90A construction schematic: West of Post Oak.

Source: TxDOT construction plans, preserved by TexasFreeway

West of Post Oak (252K)

Here we see the frontage roads and main lanes merge back together. Notice the median cut to allow left turns onto Kylewick road.

West of Post Oak (252K)
Here we see the frontage roads and main lanes merge back together.

03 / CHIMNEY ROCK

Post Oak to Chimney Rock

US 90A construction schematic: Between Post Oak and Chimney Rock.

Source: TxDOT construction plans, preserved by TexasFreeway

Between Post Oak and Chimney Rock (233K)

This is a typical section of roadway between intersections, with property access on the south (eastbound side), which is the top side in this view.

US 90A construction schematic: Between Post Oak and Chimney Rock.

Source: TxDOT construction plans, preserved by TexasFreeway

Between Post Oak and Chimney Rock (202K)

Notice the shift in alignment.

US 90A construction schematic: Between Post Oak and Chimney Rock.

Source: TxDOT construction plans, preserved by TexasFreeway

Between Post Oak and Chimney Rock (273K)

West Airport Boulevard is planned to have an overpass over 90A at this point. The overpass is not part of this project.

US 90A construction schematic: Just east of Chimney Rock at Burdine.

Source: TxDOT construction plans, preserved by TexasFreeway

Just east of Chimney Rock at Burdine (239K)

The overpass at Chimney Rock is extended eastward to accommdate a U-turn near Burdine Street.

US 90A construction schematic: Intersection at Chimney Rock.

Source: TxDOT construction plans, preserved by TexasFreeway

Intersection at Chimney Rock (294K)

Intersection at Chimney Rock.

US 90A construction schematic: Just west of Chimney Rock.

Source: TxDOT construction plans, preserved by TexasFreeway

Just west of Chimney Rock (237K)

The frontage roads and main lanes merge back together.

04 / HILLCROFT

Chimney Rock to Hillcroft

US 90A construction schematic: Between Chimney Rock and Hillcroft.

Source: TxDOT construction plans, preserved by TexasFreeway

Between Chimney Rock and Hillcroft (189K)

A typical 8 lane section of roadway.

US 90A construction schematic: East of Hillcroft.

Source: TxDOT construction plans, preserved by TexasFreeway

East of Hillcroft (232K)

The frontage roads diverge/merge from the main lanes.

US 90A construction schematic: At Hillcroft.

Source: TxDOT construction plans, preserved by TexasFreeway

At Hillcroft (286K)

Years ago I saw plans that showed a three level interchange at Hillcroft, separating Hillcroft from the railroad tracks. The final design is a standard 2-level interchange, with a railroad crossing.

US 90A construction schematic: West of Hillcroft.

Source: TxDOT construction plans, preserved by TexasFreeway

West of Hillcroft (266K)

This view shows that there will be a median cut just west of Hillcroft to allow eastbound vehicles to make a left turn. This is the only point where the westbound lanes have a grade intersection.

05 / FONDREN

Hillcroft to Fondren and Beltway 8

US 90A construction schematic: Between Hillcroft and Fondren.

Source: TxDOT construction plans, preserved by TexasFreeway

Between Hillcroft and Fondren (197K)

This view shows a typical 8-lane section.

US 90A construction schematic: East of Fondren.

Source: TxDOT construction plans, preserved by TexasFreeway

East of Fondren (197K)

This view shows another median cut to allow a left turn from the westbound lanes.

US 90A construction schematic: Just east of Fondren.

Source: TxDOT construction plans, preserved by TexasFreeway

Just east of Fondren (251K)

This view shows the frontage roads exiting/entering the main lanes.

US 90A construction schematic: At Fondren.

Source: TxDOT construction plans, preserved by TexasFreeway

At Fondren (287K)

This view shows the Fondren intersection.

US 90A construction schematic: West of Fondren.

Source: TxDOT construction plans, preserved by TexasFreeway

West of Fondren (242K)

This is near the western end of the project limits, approaching Beltway 8 (Sam Houston Tollway). The intersection at Beltway 8 is already a three level interchange, completed around 1997.