The December 2000 account records the neighborhood debate, the constrained right-of-way and the preliminary design for replacing elevated US 59 near Montrose with a trench.

Last updated December 7, 2000

Map locating the US 59 trench reconstruction near downtown Houston.

TexasFreeway Houston archive

The planned trench was immediately southwest of downtown Houston.

US 59 trench location

US-59, elevated freeway to go into trench.

From the Houston archive. This account retains its original wording, predictions and first-person judgments from December 2000.

US-59, Elevated Freeway to go into Trench

01 / December 2000 account

The proposal and neighborhood negotiations

The elevated section of US59 just southwest of downtown will be depressed into a trench, with construction scheduled to start in 2002. The $65 million project is the result of negotiations with local neighborhoods which opposed the original design.

In the mid 1990's, TxDOT proposed to add a second elevated deck to accomodate the HOV lanes that were planned for this section of freeway (see image below). The local neighborhood is a high income area and is a typical "inner loop" neighborhood. In Houston, "inner loop" is a code expression for liberal political views and a more pro-transit/anti-freeway position than the rest of Houston. So the local neighborhood quickly organized against this option and enlisted local political officials in their fight.

The second elevated deck was soon dead on arrival. TxDOT next proposed to make the deck wider to accomodate the HOV lanes. This still did not please the local opposition, which had other ideas. See the image of the urban deck that was promoted by the neighborhood and a local political official. It turned out that widening the deck would have required a full reconstruction because of shifting of the centerline, so the cost would have been quite high. Fortunately, the urban deck option died and it was decided to place 59 in a trench, like it already is in the adjacent section to the west.

The big problem with the proposed widening was a historic structure on the north side of existing freeway - the Ross Sterling Mansion. This effectively prevented expansion towards the north. On the south side, there is a high voltage right-of-way with transmission towers. Relocation would have been costly, and the right-of-way gained would not have been that large. So TxDOT was stuck with the available corridor. Consequently, no main lane capacity is being added. Ten main lanes will remain, but two HOV lanes will be added in the 192-foot-wide trench. Spur 527 leading into downtown will be reduced to two main lanes in each direction, plus two HOV lanes. (The facility currently has six main lanes and no HOV lanes.)

This project has the potential to cause massive traffic disruptions. Probably half of the freeway main lanes will need to be closed for long periods of time during construction. It won't be a good time to be a Southwest Freeway motorist!

02 / Period timeline

Freeway History

Early to mid 1960'sElevated freeway constructed.
1975 approxElevated section to the east completed, completing US59 through Houston
1992Reconstruction and expansion of the freeway to the west completed.
Mid-1990'sTxDOT proposes improvements to this section. A compromise design is reached.
1999-2001The depressed section of freeway just to the wast is widened and spanned by arched bridges.
2002Construction will begin to place the 10-lane elevated freeway into a trench.

Photos taken Summer 2000

Existing elevated US 59 near Montrose in summer 2000.

TexasFreeway Houston archive

Existing elevated US 59

This is the existing elevated freeway.

Existing US 59 overcrossing at Montrose Boulevard in summer 2000.

TexasFreeway Houston archive

US 59 overcrossing at Montrose Boulevard

This is the existing overcrossing at Montrose Boulevard. Montrose leads to the Museum district. There has been talk of building a "signature" bridge for Montrose, but as of December 2000 I am not aware of the status of this possibility.

Drawing of the original second-deck proposal for US 59.

TexasFreeway Houston schematic archive

Original US 59 second-deck proposal

These images show the original second deck design (left) and an urban deck that was proposed by the local neighborhood group (right). The urban deck was actually proposed for the section of freeway where the long span arched bridges are now being built. Neither design was adopted.

Drawing of the proposed urban deck over the US 59 trench.

TexasFreeway Houston schematic archive

Proposed urban deck over the US 59 trench

The neighborhood group proposed this urban deck for the section where the long-span arched bridges were being built. The design was not adopted.

03 / Preliminary plans

Schematics

Although these schematics are designated as "preliminary" like all other schematics prior to construction, this design is funded and any changes are likely to be minimal.

Preliminary typical cross section for the US 59 trench.

TexasFreeway Houston schematic archive

US 59 trench typical section

A typical section of the new facility. The trench will be 192 feet (59m) wide, accommodating 10 main lanes and two HOV lanes. Unfortunately, the main lanes will be reduced an a width of 11 feet.

Preliminary cross section for US 59 before the Spur 527 split.

TexasFreeway Houston schematic archive

US 59 cross section before the Spur 527 split

The freeway cross section just before the Spur 527 split. It will be very difficult to keep traffic moving while this is under construction.

Annotated preliminary US 59 plan near the Spur 527 split and Main Street exit.

TexasFreeway Houston schematic archive

US 59 plan near the Spur 527 split

Notice the new exit ramp to Main Street. The dark shaded area is new right-of-way acquisition that is planned as stormwater retention ponds.

High resolution (1308k) Medium resolution (380k) - Best for viewing

Photograph viewer

Original image ↗Next collection →