Houston / Beltway 8 construction archive
US 59 / Beltway 8 North construction
10 photographs, a locator map and a schematic · 2000–2002 archive
Ten photographs follow the Beltway 8 main lanes and first direct connector at US 59 from early piers in June 2000 through March 2002. The archive also preserves the location map and planned five-level stack schematic.
↗ EnlargeCollection: TexasFreeway Houston construction photographs
The first direct connector curves over US 59 while traffic continues below.
Browse the construction dates
The connector over US 59
March 12, 2002
March 12, 2002 photographs
2 construction photographsConnector piers and feeder roads
December 20, 2001
December 20, 2001 photographs
2 construction photographs
20 December 2001
North along the US 59 feeder

20 December 2001
East along the Beltway 8 feeder
Main-lane and connector piers
May 2001
May 2001 photographs
3 construction photographsEarly direct-connector work
October 2000
October 2000 photograph
1 construction photographThe first bridge piers
June 2000
June 2000 photographs
2 construction photographs
June 2000
Piers east of US 59

June 2000
Piers west of US 59
From the original archive
Original project account and plans
Stack construction at US59/Beltway 8 North
| Project | Beltway 8 main lanes and one direct connector, eastbound BW8 to northbound US 59 |
|---|---|
| Cost | $35.8 million |
| Begin | Q4 1999 |
This section of Beltway 8 is a freeway, not a tollway, and the new Beltway 8 main lanes will be free. In the long term, a full stack is planned at this location. This project includes only one direct connector. The remaining connectors will be added over the next 10-15 years.