TexasFreeway

Preserving the travel history of Texas.

Archive photographs

New Frontage Road South of Tomball

Poor image quality due to cloudy weather in Houston

Northward view from the end of the SH 249 main lanes, with the old highway in the foreground and frontage roads at both sides.↗ EnlargeMay 1, 2002

Collection: TexasFreeway Houston photographs

End of the SH 249 main lanes

The end of the main lanes.
Northward view of the old four-lane highway being removed between the newly completed SH 249 frontage roads.↗ EnlargeMay 1, 2002

Collection: TexasFreeway Houston photographs

Old highway and future main lanes

In the foreground are the remains of the old four-lane highway, currently being removed. On the far left and near right are the just-completed frontage roads. View looks north.
View of the abandoned old highway where future SH 249 main lanes would be built, with frontage roads at the edges.↗ EnlargeMay 1, 2002

Collection: TexasFreeway Houston photographs

The abandoned highway corridor

The abandoned old highway. The future main freeway lanes will be built in this spot. The frontage roads can be seen at the far edges. The freeway corridor width is 350 feet (106.68 m).

From the original archive

SH 249 archive notes

View the BW8 connector plan and commentary
Annotated aerial plan of the proposed SH 249 and Beltway 8 direct connectors.

3 direct connectors at BW8/Sam Houston Tollway

May 1, 2002

This $27.4 million project is scheduled to be let in August 2002. The fourth and much-needed direct connector from 249 south to BW8 west is not being built at this time because of cost reasons. I was surprised to see that the EB BW8 to NB 249 connector goes underneath BW8. Also, note that a long stretch of northbound 249 will get 2 more lanes. (Section with new lanes extends well north of this view.) (click for high resolution, 621k)

Source: TexasFreeway archive

Photograph viewer

Original image ↗Next collection →