Six views follow the US 59 South stack from its partially completed form around 1996 to the feeder roads and high connector ramps of the finished interchange.
Six interchange photographs · page updated November 30, 2000

Collection: TexasFreeway Houston photographs
The interchange rises ahead, with connector ramps stacked above the frontage roads.
US 59 South interchange photographs
US 59 South interchange
↗ EnlargeApproaching the US 59 South stack
↗ EnlargePartially completed US 59 South stack
This photo, taken circa 1996, shows the partially complete stack, before Beltway 8 was constructed.
↗ EnlargeSouth from the Beltway 8 feeders
Looking towards the south with the NB BW8 feeders in the foreground. This ramp is unusually high for a "right-turn" ramp.
From the original archive
Beltway 8 / US 59 South Stack
Beltway 8 / US 59 South Stack
This stack was completed in 2 phases. Four direct connectors were completed around 1993. This is shown in the aerial photo to the right. The Beltway 8 main lanes and remaining 4 connectors were completed in 1998.