North Beltway construction

Beltway 8 construction photographs

Piers for the eastbound-to-southbound connector↗ EnlargeOctober 2000

Collection: TexasFreeway Houston photographs

Piers for the eastbound-to-southbound connector

Construction of direct connector ramps at the BW8/IH-45 interchange, October 2000. This view looks east, showing piers for the connector from eastbound BW8 to southbound IH-45.

Piers for the northbound-to-westbound connector↗ EnlargeOctober 2000

Collection: TexasFreeway Houston photographs

Piers for the northbound-to-westbound connector

Construction of direct connector ramps at the BW8/IH-45 interchange, October 2000. This view looks east, showing piers for the connector from northbound IH-45 to westbound BW8.

Connector piers across US 59↗ EnlargeOctober 2000

Collection: TexasFreeway Houston photographs

Connector piers across US 59

Construction of the direct connector at the BW8/US59 interchange, October 2000. This view looks northeast across US59, showing piers for the connector from eastbound BW8 to northbound US59.

The long bridge east of US 59

June 2000

Collection: TexasFreeway Houston photographs

The long bridge east of US 59

Photo taken June 2000. These are some of the piers east of US 59. This will form part of the long bridge that extends about 1 mile east of 59.

Piers west of US 59

June 2000

Collection: TexasFreeway Houston photographs

Piers west of US 59

These are the piers on the west side of US59. The eastbound BW8 feeder is in the foreground, and US 59 can be seen in the background. As of June 2000, no significant work had been done on the direct connector from EB BW8 to NB US 59.

Hardy Toll Road piers in May 2001

May 20, 2001

Collection: TexasFreeway Houston photographs

Hardy Toll Road piers in May 2001

(high resolution 94k) On May 20, 2001, the piers along the Hardy Toll Road were in place. 20-May-2001.

Route orientation

North Beltway construction location map

North Beltway construction location map

North Beltway construction location map

From the original archive

Beltway 8: the original construction account

View the interchange schematics
Planned Beltway 8 / US 59 stack

Planned Beltway 8 / US 59 stack

This schematic view shows the planned 5-level stack at BW8 and US 59. In 2001, the BW8 main lanes and 1 direct connector are under construction.

Source: TexasFreeway archive

The planned Hardy Toll Road connector

The planned Hardy Toll Road connector

This is a map view of the new connector from EB BW8 to the NB Hardy Toll road. This will be the first direct connector at this interchange. Connections presently must be made via the feeders. At .905 miles (1.46 km) long, this is a very long ramp.

Source: TexasFreeway archive