Houston / Construction archive
Building the north Beltway
Bare piers, unfinished ramps and a mile-long bridge: these views show Beltway 8 taking shape at I-45, US 59 and the Hardy Toll Road in 2000–2001.
Last updated 28-May-2001 (add photo), created July 2000

Collection: TexasFreeway Houston photographs
The ramps before the roadway.
North Beltway construction
Beltway 8 construction photographs
↗ EnlargePiers for the eastbound-to-southbound connector
Construction of direct connector ramps at the BW8/IH-45 interchange, October 2000. This view looks east, showing piers for the connector from eastbound BW8 to southbound IH-45.
↗ EnlargePiers for the northbound-to-westbound connector
Construction of direct connector ramps at the BW8/IH-45 interchange, October 2000. This view looks east, showing piers for the connector from northbound IH-45 to westbound BW8.
↗ EnlargeConnector piers across US 59
Construction of the direct connector at the BW8/US59 interchange, October 2000. This view looks northeast across US59, showing piers for the connector from eastbound BW8 to northbound US59.
Route orientation
North Beltway construction location map

North Beltway construction location map
From the original archive
Beltway 8: the original construction account
View the interchange schematics

Planned Beltway 8 / US 59 stack
Source: TexasFreeway archive

The planned Hardy Toll Road connector
Source: TexasFreeway archive
Beltway 8 / Sam Houston Tollway
Explore the individual construction collections: I-45 North, Hardy Toll Road, and US 59 North.
Beltway 8 is the second loop around Houston. The entire loop, except of the ship channel bridge, includes free feeder roads which are officially designated as Beltway 8 (BW8). Most of the the main lanes are toll lanes and are designated as the Sam Houston Tollway. I will usually refer to the facility (both feeders and mainlanes) as BW8.
BW8 saw a tremendous amount of activity in the late 1980's and all of the 1990's. Nearly all of the roadway was built during that period, including five 5-level stacks. The current activity on BW8 is on the north segment between I45N and US59 north. This section of BW8 was the first to be built as a feeder road facility in the late 1960's when Intercontinental Airport (now Bush Intercontinental Airport) was opened. Today it is the only freeway section of BW8.
There are three contracts underway as of July 2000. The first project will build the four remaining direct connectors at the I45/BW8 interchange to complete the 5-level stack. The second project will add one direct connector at the BW8/Hardy Toll Road interchange, which presently has no direct connectors. The third project will extend the freeway over US 59 and add one direct connector at that interchange.
| Location | Cost $ (millions) |
Start | Finish | Description |
|---|---|---|---|---|
| Interchange at I-45N | 36.4 | 2/00 | Q2/03 | Complete 4 remaining direct connectors for 5-level stack |
| Interchange at Hardy Toll Road | 12.4 | 6/00 | Q4/02 | Add direct connector, EB BW8 to NB tollway |
| Main lanes from west of US59 to east of US59 | 35.4 | 11/99 | Q4/02 | Add freeway main lanes over Lee Rd, US59, and Old Humble Add one direct connector, EB BW8 to NB US59 |