Dallas–Fort Worth · SH 190 and SH 161

Building SH 190 and SH 161

31 photographs and 6 maps · 2000–2001 archive

Concrete piers, unfinished toll lanes and a five-level stack record how SH 190 and SH 161 came together across northwestern Dallas County. The photographs move from early structures in 2000 to nearly complete SH 161 lanes in September 2001.

161-190 Dallas↗ Enlarge

The toll plaza takes shape between SH 183 and SH 114.

31 photographs and 6 maps · One continuous collection

Follow SH 190 and SH 161 from piers to pavement.

Scan the photographs and captions, or settle into the larger slideshow.

Explore the SH 190 and SH 161 construction archive

Jump to section
SH 190 and SH 161 constructionBack to top ↑

8 photographs and 5 locator maps

Early SH 190 and SH 161 construction

SH 190 and SH 161 construction photographs, September 2000

8 archive photographs

SH190 (President George Bush Turnpike) and 161 Construction, September 2000

Last updated September 2000

Return to 190/161 Construction Index | Go to May 2001 photos

As of September 2000, there are 4 major construction projects underway on these facilities.
See the location map

  • 190 tollway main lanes between I-35E and Dallas North Tollway
  • 5-level stack at 190 and I-35E
  • Interchange at 161 and I-635
  • 161 tollway main lanes south of I-635

All photos taken Labor Day weekend, September 2000

12 photographs and one location map

SH 190 and SH 161 construction in May 2001

SH 161 and SH 190 construction, May 2001

12 archive photographs

SH190 (President George Bush Turnpike) and 161 Construction, May 2001

Last updated June 10, 2001

Return to 190/161 Construction Index | Go to September 2000 photos

As of May 2001, the construction is over 50% complete. The 190 main lanes between the Dallas North Tollway and IH-35E are about 75-80% complete.

All photos taken May 12 and May 14, 2001

Photos start at the south end of this section and proceed north and eastward

190-161 location map

May 2001

SH 190 and SH 161 photograph locations

Locations of the photos below.

11 photographs

SH 161 construction in September 2001

SH 161 construction, September 2001

11 archive photographs

161 Construction, 16-September-2001

Last updated October 10, 2001

Return to 190/161 Construction Index | Go to September 2000 photos | Go to May 2001 photos

As of September 2001, the 161 main lanes are substantially complete and the interchange at IH-635 is about 75% complete.

All photos taken 16-September-2001

Photos start at the south end of this section and proceed north