Dallas–Fort Worth / Photo archive
Texas 161 road photographs
September 2000–September 2001 · Historical photographs
These six photographs show SH 161 with its SH 183 interchange complete and the tollway southward still planned. The views move from connector ramps to the wide corridor north of the interchange.
↗ EnlargeThe interchange was open; the southward extension was still ahead.
September 2000–September 2001 · 3 photographs
The SH 183 interchange
↗ EnlargeSH 161 connector ramps at SH 183
↗ EnlargeSouthward-extension stub-out
↗ EnlargeConnection ramps along the SH 183 feeder
September 2000–September 2001 · 3 photographs
Connector ramps and northbound main lanes
↗ EnlargeSouthbound SH 161 to eastbound SH 183
↗ EnlargeThe SH 161 corridor north of SH 183
↗ EnlargeSH 161 main lanes north of SH 183
September 2000–September 2001 · 1 photographs
Original archive notes and corridor map
Texas 161
Also see: 161 construction photos, September 2001 | 161 and 190 Construction Images
About 3 miles of the 161 freeway north of 183 was completed in the early 1990's. In July 2000, four direct connectors where completed at the 183 interchange. In late 2001 or early 2001, the 161 tollway main lanes will be opened from the current freeway terminus to IH-635.
↗ Enlarge