Dallas–Fort Worth / Photo archive
Dallas North Tollway, 1998–2001
1998–2001 · Historical photographs
Eight views follow the Dallas North Tollway from its narrow corridor near Loop 12 to the four-level stack at the Bush Turnpike. The first aerial photograph looks south from I-635; the driving sequence then heads north.
↗ EnlargeA narrow corridor, seen from above and behind the wheel.
1998–2001 · 3 photographs
I-635 overview and the Loop 12 corridor
↗ EnlargeDallas North Tollway at I-635
↗ EnlargeNorthbound south of Loop 12
↗ EnlargeThe Loop 12 exit
1998–2001 · 3 photographs
Forest Lane, I-635 and Spring Valley
↗ EnlargeSouth of Forest Lane
↗ EnlargeThe I-635 interchange
↗ EnlargeNear Spring Valley
1998–2001 · 2 photographs
Approaching the Bush Turnpike
1998–2001 · 1 photographs
Original interim account and map
Dallas North Tollway Interim Coverage
The Dallas North tollway is unique in the DFW Metroplex because it is built on an extremely narrow right-of-way. Between downtown and IH-635 LBJ Freeway, the corridor is about 100 feet wide. From IH-635 to 190/Bush Turnpike, the corridor is about 200 feet wide, but this section also includes feeder roads so the corridor is fully maxed out. The newer section north of 190/Bush Turnpike has a more reasonable corridor width of about 300 feet. However, this is still substantially more narrow that the 400-foot-wide corridor that is standard for new freeways in Dallas-Fort Worth.
The Dallas North Tollway has six main lanes for its entire length. The facility has feeder roads north of IH-635. There are plans to extend the tollway northward from its current terminus at 121. Eventually, the tollway will reach all the way to 380.
Eventually I will get a more comprehensive set of photos of the North Dallas Tollway. I decided to put these interim photos online until I can provide full coverage.
↗ Enlarge

