Dallas–Fort Worth / Driving archive
Drive the Bush Turnpike in August 2001
The newly connected Bush Turnpike crossed northern Dallas from I-35E to Garland. Follow these August 2001 views past fresh pavement, unfinished signs and interchanges with room to grow. The photographs stay in their original west-to-east sequence.
West to east · August 19, 2001
An introductory toll-plaza photograph is followed by 31 views in the original route sequence.
Bush Turnpike: west to east, August 2001
01Before the drive: the toll plaza

Before the drive: the toll plaza
August 19, 2001
So, enjoy the cruise on this impressive new facility. If you have a tolltag, you won't have to stop.02The I-35E approach

The I-35E approach
August 19, 2001
(high resolution 150k) View along the southbound lanes of Interstate 35E. The ramp to 190/GBT is on the left. At the time of the photo, the IH-35E traffic was diverted to the future feeder road, which is why the ramp is on the left.03Closer to the I-35E stack

Closer to the I-35E stack
August 19, 2001
(high resolution 177k) Another view of the interchange from the IH-35E southbound main lanes.04East from the connection ramp

East from the connection ramp
August 19, 2001
(high resolution 208k) Looking east along the 190/GBT from the connection ramp at IH-35E. The 190/GBT main lane deck is wide enough for 5 lanes in each direction through the interchange.05The elevated structure

The elevated structure
August 19, 2001
On the elevated structure just west of IH-35E, with an overhead sign still under construction.06The eastbound beginning

The eastbound beginning
August 19, 2001
(high resolution 126k) The beginning of 190/GBT, going eastbound.07Old Denton Road

Old Denton Road
August 19, 2001
(high resolution 149k) At Old Denton Road.08East of Old Denton Road

East of Old Denton Road
August 19, 2001
(high resolution 106k) East of Old Denton Road.09Kelly Road

Kelly Road
August 19, 2001
(high resolution 140k) At Kelly Road.10The northeast curve

The northeast curve
August 19, 2001
East of Kelly road, 190/GBT curves toward the northeast.11The west toll plaza

The west toll plaza
August 19, 2001
(high resolution 92k) The west toll plaza.12Approaching Midway

Approaching Midway
August 19, 2001
(high resolution 111k) Approaching Midway.13East from the Marsh overpass

East from the Marsh overpass
August 19, 2001
(high resolution 180k) Looking east from the Marsh overpass.14Midway

Midway
August 19, 2001
(high resolution 111k) At Midway.15Dallas North Tollway

Dallas North Tollway
August 19, 2001
(high resolution 141k) At the Dallas North Tollway.16East of the Tollway

East of the Tollway
August 19, 2001
(high resolution 76k) Just east of the Dallas North Tollway.17Preston Road exit

Preston Road exit
August 19, 2001
(high resolution 93k) At the Preston Road exit.18Coit Road exit

Coit Road exit
August 19, 2001
(high resolution 98k) At the Coit Road exit.19East from Coit Road

East from Coit Road
August 19, 2001
(high resolution 98k) Looking east from the Coit Road overpass.20East from Independence Road

East from Independence Road
August 19, 2001
(high resolution 126k) Looking east from the Independence Road overpass.21Another Independence Road view

Another Independence Road view
August 19, 2001
Another view looking east from the Independence Road overpass.22Alma

Alma
August 19, 2001
At Alma.23US 75 exit

US 75 exit
August 19, 2001
The exit to US 75. 190/GBT is the top level of the 4-level stack at US 75, so no ramps are visible.24South along US 75

South along US 75
August 19, 2001
(high resolution 223k) View looking south from the 190/GBT overpass, looking along US 75. In the background is the "Telecom Corridor", which was in a state of devastation as of August 2001 due to the telecom industry bust.25East of US 75

East of US 75
August 19, 2001
Just east of US 75. Notice the extra pavement available on the left for future widening.26Renner Road

Renner Road
August 19, 2001
At Renner Road.27Shiloh Road

Shiloh Road
August 19, 2001
At Shiloh Road.28Garland lane construction

Garland lane construction
August 19, 2001
In Garland, a third lane is already being added to the original 2 lanes.29Southeast through Garland

Southeast through Garland
August 19, 2001
Continuing towards the southeast in Garland.30Approaching SH 78

Approaching SH 78
August 19, 2001
(high resolution 111k) Approaching he current end of 190/GBT at route 78.31Under SH 78 and the railroad

Under SH 78 and the railroad
August 19, 2001
The current end of 190/GBT as it passes underneath 78 and the railroad tracks.32Northeast Parkway

Northeast Parkway
August 19, 2001
After going under 78, 190/GBT turns into the Northeast Parkway. This is only temporary, because the east 190/GBT should start construction around 2004.
Original introduction and route map
Driver's View of the 190 President George Bush Turnpike West to East, August 19, 2001
Also see: 190 main page | 190/161 construction images
On July 31, 2001, the section of the 190/Bush Turnpike (190/GBT) from IH-35E to Midway Road was opened, providing a continuous facility from IH-35E in the west to US 78 in the east. This is the first new continuous east-west freeway crossing of north Dallas since the opening of IH-635 in 1968.