SH 45 North - March 25, 2001 Construction Photos
Austin · March 25, 2001
At I-35, an isolated bridge pier and two views along the open SH 45 corridor show how much right-of-way the planned feeder roads required in March 2001.
↗ EnlargeA bridge pier beside I-35, March 2001.
March 25, 2001 · 3 photographs
From I-35 west along the SH 45 corridor
↗ EnlargeI-35: westbound feeder bridge pier
(High resolution 170k) Looking north along IH-35. The bridge pier will support the westbound SH45 feeder road.
↗ EnlargeI-35: looking east along the SH 45 corridor
(High resolution 131k) Looking east along the SH 45 corridor from IH-35. Note that the 400 foot (122m) wide right-of-way extends all the way to the thin black erosion control barrier along the right side of the photo.
↗ EnlargeWest of I-35: looking east
(High resolution 204k) Looking east along the SH 45 corridor, about half a mile west of IH-35.
