TexasFreeway

Preserving the travel history of Texas.

Austin road archive

Mopac through Austin

Austin · Photographs from 2000–2001

Mopac follows a railroad corridor from north Austin through a narrow central right-of-way and south across Barton Creek. These 2000–2001 photographs trace its changing width, landscape and interchanges from end to end.

Loop 1↗ Enlarge

Mopac crosses Barton Creek and the greenbelt.

2000–2001 · 6 photographs

North Mopac

Many photos taken during summer and fall of 2000, during severe drought

Loop 1↗ EnlargeSummer 2000

Northern terminus near Parmer Boulevard

Loop 1↗ Enlarge

Northern terminus locator map

The current northern terminus of Loop 1, just north of Parmer Boulevard. Loop 1 will be extended northward as a tollway, with construction likely to begin in 2001. Photo taken summer 2000.

Loop 1↗ EnlargeMarch 2001

Loop 1 north of Braker Road

Loop 1↗ Enlarge

Braker Road locator map

A typical view of the north section Loop 1, which opened in 1990. This view is looking north, just north of Braker Road. Photo taken March 2001.

Loop 1↗ Enlarge

Loop 1 north of Loop 360

Loop 1↗ Enlarge

Loop 360 locator map

Loop 1 just north of Loop 360. This view looks north.

Back to top ↑

2001 · 9 photographs

Central Mopac

Loop 1↗ Enlarge

Northward view from 35th Street

Loop 1↗ Enlarge

35th Street locator map

Looking north from the 35th Street overcrossing. Camp Mabry (Reserves Base) is on the left. TxDOT offices are on the right.

Loop 1↗ Enlarge

Southward view from 35th Street

Looking south from the 35th Street overcrossing. At this point, Loop 1 transitions into neighborhood areas. The narrow right-of-way width of the corridor can be seen. This section is the most controversial in a study to determine the future improvements to the roadway, since right-of-way acquisition and home displacement will be necessary to expand the freeway. The recommended alternative will be announced by March 2001.

Loop 1↗ Enlarge

Central Loop 1 right-of-way diagram

This view shows just how narrow the right-of-way is for central Loop 1. The corridor with is only 172 feet (52m) wide, but 60 feet (18m) is used by the railroad, leaving only 112 feet (34m) for the freeway main lanes.

Loop 1↗ EnlargeMarch 10, 2001

Northward view from Barton Skyway

Loop 1↗ Enlarge

Barton Skyway locator map

(High resolution 112K) Looking north from the Barton Skyway overpass. Photo taken 10-March-2001.

Loop 1↗ EnlargeMarch 10, 2001

Southward view from Barton Skyway

(High resolution 120K) Looking south from the Barton Skyway overpass. Photo taken 10-March-2001.

Loop 1↗ EnlargeMarch 10, 2001

Loop 1 sign north of Barton Creek

Loop 1↗ Enlarge

Barton Creek locator map

(High resolution 99K) Looking south from the just north of Barton Creek. Photo taken 10-March-2001.

Back to top ↑

2001 · 6 photographs

Barton Creek and south Mopac

Loop 1↗ Enlarge

Barton Creek bridge and greenbelt

Looking north over the Barton Creek bridge and Barton Creek Greenbelt crossing.

Loop 1↗ Enlarge

Southern freeway terminus

Loop 1↗ Enlarge

Southern terminus locator map

The current terminus of the freeway main lanes just south of US290. The missing link of freeway will start construction in 2002.

Loop 1↗ Enlarge

Loop 1 north of Slaughter Lane

Looking north just north of Slaugher Lane.

Loop 1↗ EnlargeMarch 10, 2001

Loop 1 near Circle C

Loop 1↗ Enlarge

Circle C locator map

(High resolution 102K) Loop 1 near its south terminus at SH 45 in the Circle C real estate development, looking south. This area was the scene of legal battles between developers and environmentalists for most the 1990s. Around 1999, an agreement was finally reached to allow a certain amount of development in this region, which is part of the Barton Springs recharge zone. Photo taken 10-March-2001.

Back to top ↑

Photograph viewer

Original image ↗Next collection →