5 level stack at I35 and US71/US290 (Ben White Blvd), south side of Austin
Construction views from 2000 and 2001 · Last updated 26-August-2001
Tall connector piers rise above Ben White Boulevard. These 2000–2001 photographs follow the foundations of Austin’s five-level interchange.
↗ EnlargeConnector piers beneath August storm clouds.
26-August-2001 · 3 photographs
26-August-2001
↗ EnlargeStorm clouds over the construction zone
(high resolution 155k) Looking northeast, with storm clouds brewing over the construction zone. And yes, we actually received some desperately needed rain in Austin, more than 2 inches in many places. Great, great news for dessicated Austin.
↗ EnlargeEastward view of the Texas 71 trench
(high resolution 271k) Looking east, with the trench for the 71 main lanes at left.
↗ EnlargeI-35 main lanes and connector ramps
(high resolution 137k) Looking southeast, with the IH-35 main lanes in the foreground and connector ramps under construction in the background.
January 2001 · 3 photographs
January 2001 - Substantial Progress on Excavation
↗ EnlargeTexas 71 excavation west of I-35
Excavation on the west side of IH-35 for the SH71 main lanes, which will be depressed below grade. This view looks west. Photo taken January 20, 2001.
↗ EnlargeTexas 71 excavation east of I-35
Excavation on the east side of IH-35 for the SH71 main lanes. This view looks north. The piers in the foreground are for the widened IH-35 northbound main lanes. The bridge abutment for the northbound at-grade feeder road can be seen on the right. In the background are piers for the direct connector ramps. Photo taken January 20, 2001.
↗ EnlargeExisting Texas 71 and US 290 main lanes
This view shows the existing SH71/US290 main lanes on the west side of the interchange. Piers for a direct connecter rise beside the road. This view looks towards the northwest. Photo taken January 20, 2001.
June and August 2000 · 2 photographs
June 2000: Work is just getting underway
↗ EnlargeEarly interchange construction
In August 2000, construction was in its early stages. The existing I-35 overpass can be seen in the background.
↗ EnlargeTraffic on the original I-35 bridge
In June 2000, the existing I35 bridge over 71/290. The existing bridge is a first-generation TxDOT design, dating from the 1950's. Bring on the wrecking ball to tear it down!