(In Development)
Click on...
 To open a submenu
 To close a submenu
 A link to go to the page |
Beltway 8 / I-10 East Stack
Last updated August 2000
|
This 4-level stack was completed in 1995. Due to the geometric design, the
ramps are widely separated and do not need to attain the same elevation
as some of the other stacks. Note that the I-10 EB to BW8 SB connector
goes underneath BW8, resulting in the 4-level stack.
|
 |
Looking north, with the SB BW8 feeder in the foreground.

Looking northwest.
|
|