Stack construction at US59/Beltway 8 North

Last updated 13-March-2002

Project Beltway 8 main lanes and one direct connector, eastbound BW8 to northbound US 59
Cost $35.8 million
Begin Q4 1999

This section of Beltway 8 is a freeway, not a tollway, and the new Beltway 8 main lanes will be free. In the long term, a full stack is planned at this location. This project includes only one direct connector. The remaining connectors will be added over the next 10-15 years.

Construction location: US59/BW8


This schematic view shows the planned 5-level stack at BW8 and US 59. In 2001, the BW8 main lanes and 1 direct connector are under construction.

March 12, 2002
US59/BW8 Stack Construction
(high resolution 123k) Looking north along US 59. Photo taken 12-March-2002.

US59/BW8 Stack Construction
(high resolution 172k) Looking northeast, with the beltway 8 eastbound feeder in the foreground. Photo taken 12-March-2002.

December 20, 2001
US59/BW8 Stack Construction
Looking north along the southbound US 59 feeder road. Photo taken 20-December-2001.

US59/BW8 Stack Construction
(high resolution 184k) Looking east along the Beltway 8 feeder road. Substantial progress is being made on the direct connector piers. Photo taken 20-December-2001.

May 2001
US59/BW8 Stack Construction
(high resolution 184k) Looking east along the Beltway 8 feeder road. Photo taken 20-December-2001.

US59/BW8 Stack Construction
(high resolution 150k) Looking north along the US 59 feeder road, with the direct connector piers in the background. Photo taken 22-May-2001.

US59/BW8 Stack Construction
(high resolution 150k) Looking southeast at the piers for the Beltway 8 main lanes. No progress on the bridge deck yet. Photo taken 22-May-2001.

October 2000

Construction of the direct connector at the BW8/US59 interchange, October 2000. This view looks northeast across US59, showing piers for the connector from eastbound BW8 to northbound US59.
June 2000

BW8 at US59
Photo taken June 2000. These are some of the piers east of US 59. This will form part of the long bridge that extends about 1 mile east of 59.

BW8 at US59
These are the piers on the west side of US59. The eastbound BW8 feeder is in the foreground, and US 59 can be seen in the background. As of June 2000, no significant work had been done on the direct connector from EB BW8 to NB US 59.

 
Austin
| Corpus Christi | Dallas/Fort Worth | El Paso | Houston | San Antonio
Statewide | Other Resources | about TexasFreeway.com | Contact Info | Home | Site Index
 
TexasFreeway.com is not associated with TxDOT or any other government agency.
All information is unofficial and "AS IS" with no guarantees for accuracy. All schematics are preliminary except as noted.
 
© 2007-2008 TexasFreeway.com